KeNHA closes section of Kenol – Sagana Road

 

Road work undergoing
National Highways Authority (KeNHA) has closed of a section of the Nairobi Bound Lanes along Kenol – Sagana (A2) Road.
This following heavy rainfall that led to debris falling from back slope of the road section at Mungetho area.
KeNHA in a statement, have advised motorists to share lanes with the Sagana Bound Traffic and adhere to instructions provided by traffic Marshals at the location as the Authority works to restore the normal traffic flow.
By Christine Muchira

More From Author

French government injects Ksh.168M into Kenyan creative industries

Nairobi County spells out measures to tackle floods

Leave a Reply

Your email address will not be published. Required fields are marked *